# Can two people edit a tour at the same time?

URL: https://www.panoramr.com/about/faq/can-two-people-edit-a-tour-at-once
Keywords: simultaneous editing, collaborate, work together, editing together, overwritten changes, lost changes, conflict, keep mine, take theirs, invite collaborator
Last checked: 2026-10-29

Yes, for hotspots. Two people can edit the hotspots of one panorama on the **Hotspots** tab at the same time and both keep their work. The tab saves only what each person changed, hotspot by hotspot and field by field, half a second after the last change, and adds it to what is stored. Different hotspots, or different fields of one hotspot, both land. Only when you both set the same field of the same hotspot to different values, or one of you deletes a hotspot the other changed, does a box ask you to choose **Keep mine** or **Take theirs**.

Two things are not live. You do not see the other person's changes as they make them: they arrive with your next save, and a reload shows them now. Undo takes back only your own changes and leaves a hotspot someone else has changed since.

This works on the **Hotspots** tab; on the other tabs, take turns. To add the second person, the tour's owner shares the tour on the **Settings** tab under **Project Collaborators**; an Editor or Admin can edit hotspots, a Viewer cannot. [Edit hotspots with someone else at the same time](https://www.panoramr.com/help/edit-hotspots-at-the-same-time) has the details, and [Invite collaborators to a tour and set their role](https://www.panoramr.com/help/managing-team-access-and-project-roles) the roles.

More: [Edit hotspots with someone else at the same time](https://www.panoramr.com/help/edit-hotspots-at-the-same-time), [Invite collaborators to a tour and set their role](https://www.panoramr.com/help/managing-team-access-and-project-roles)
